Bathroom refits
One team, from strip-out to the last tile.
Plumbers, tilers and an electrician who work together every week, a fixed written quote, and a project lead who answers the phone. Most refits take 8 to 14 working days.
Recent projects
Bathrooms we've finished.
Every project lists its time on site and the fixed price the client agreed. Filter by style to find one close to what you have in mind.
9 projects shown
Twin basins in Naxxar
Twin vanity, walk-in shower and a linear drain
Modern, 9 days, €8,900Green marble en-suite, Sliema
Book-matched marble-effect porcelain, floor to ceiling
Modern, 11 days, €11,400Freestanding bath, Lija
Roll-top bath, nickel fittings, patterned floor
Classic, 12 days, €12,800Level-access wet room, Attard
Step-free shower, fold-down seat, grab rails
Accessible and Modern, 8 days, €7,600Marble vanity, St Julian's
Stone vanity top, wall-hung WC, brass taps
Classic, 7 days, €6,300Guest shower room, Mosta
Large mirror wall, compact shower, hidden cistern
Modern, 6 days, €5,400Farmhouse bathroom, Għarb
Bath under the window, limestone-look tiles
Classic, 13 days, €10,200Walk-in shower, Birkirkara
Frameless glass, slip-rated floor, thermostatic valve
Accessible, 7 days, €6,900Blue vanity family bathroom, Żebbuġ
Painted vanity, bath-shower, heated towel rail
Classic, 9 days, €7,800
Before and after
Drag to see the difference.
Each slider is the same room, photographed by our project lead on the strip-out day and again at handover.
Sliema en-suite
Galvanised pipes out, PEX manifold in. 11 days.
Attard wet room
Bath removed, floor lowered for a step-free shower. 8 days.
St Julian's vanity
Wastes re-run for a wall-hung WC. 7 days.
How a refit runs
Five stages, one fixed price.
You get a day-by-day schedule before we start, and a WhatsApp update with photos at the end of every working day.
- Week 1, free
Survey
We measure, check the pipes and drainage falls, and talk through how you use the room.
- Within 5 days
Design and quote
A 3D layout, tile and fittings choices, and a fixed written quote. No deposit until you're happy.
- Days 1–2
Strip-out
Dust sheets down, old suite and tiles out, skip permit handled by us.
- Days 3–9
Fit
New pipework, screed, tanking, tiling and sanitaryware, with a pressure test before any tile goes on.
- Days 10–12
Finish
Silicone, accessories, deep clean and a walk-through. Your 12-month guarantee starts here.
Free survey
Book a free bathroom survey.
Our project lead visits for about 45 minutes, usually on a weekday evening between 17:00 and 18:30. You'll have a fixed quote within five working days.
Survey booked
Thanks there. Our project lead will call today to agree an evening that suits you, and send a WhatsApp reminder the day before.
Demo form, nothing is sent.
Water through the ceiling? Smell gas?
Our emergency van covers Malta day and night, Gozo by the next ferry. Shut the main stopcock (usually beside the meter or under the kitchen sink), then call.
If you smell gas: close the cylinder valve, open windows and doors, don't touch switches or light anything, and call from outside.